200A 120/240VAC 3-Gang Meter Pack with Horn Bypass 1MM320RRLB
/products/200a-120-240vac-3-gang-meter-pack-with-horn-bypass-1mm320rrlb
Items in Cart ()
View cart

200A 120/240VAC 3-Gang Meter Pack with Horn Bypass 1MM320RRLB

200A 120/240VAC 3-Gang Meter Pack with Horn Bypass 1MM320RRLB
Roll over image to Zoom
200A 120/240VAC 3-Gang Meter Pack with Horn Bypass 1MM320RRLB
Roll over image to Zoom
200A 120/240VAC 3-Gang Meter Pack with Horn Bypass 1MM320RRLB
Roll over image to Zoom
200A 120/240VAC 3-Gang Meter Pack with Horn Bypass 1MM320RRLB
SKU: 1MM320RRLB

Availability: In stock

Price:
Regular price
$1,513.52
Sale price
$1,513.52
Shipping Cost Calculated at Checkout. Standard Lead Time is 1 to 6 Business Days.
Quantity must be 1 or more

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Where are we? 4 Continents 9 Countries

map
garrie

Got any Questions?

Speak with a real person who will go out of their way to help you!

Call Us: 1-516-482-6313Text Us: 1-516-703-3460

Product Information

Specification

About :

The Meter Pack refers to a metering assembly used by electrical utilities to measure and record electricity usage for multiple units in residential or commercial buildings. These are commonly used in apartment complexes, duplexes, and townhomes where several units are clustered together.

Also Known As :

Meter Pack, Gang Meter, Multiple Meter Assembly, Multi Gang Meter

Specification :

Number of Gangs 3
Current Rating per Position 200A
Voltage Rating 120/240VAC
Total Bussing Capacity 800A
Product Height
52.35 in
Product Length/Depth
7.01 in
Product Width 13.5 in
Product Type
Meter Pack
Certifications
UL Listed
Type
Multiple metering
Utility approvals
IA : Alliant (IP&L and WP&L)
WI : Alliant (IP&L and WP&L)
IL : Commonwealth Edison (Com Ed) / CECHA
MI : Consumers Energy
MD : First Energy (Potomac Edison)
VA : First Energy (Potomac Edison)
WV : First Energy (Mon Power)
NJ : First Energy (Jersey Central Power and Light)
OH : First Energy (Ohio Edison, Toledo Edison, The Illuminating Company)
PA : First Energy (Allegheny Power, MET ED, Penelec, West Penn Power)
NY : Orange & Rockland Utilities
PA : PECO Energy
WI : WE Energies / Wisconsin Public Service (WPS)
PA : Pennsylvania Power & Light (PPL)
NY : Rochester Gas & Electric (RG&E)
NY : New York State Electric & Gas (NYSEG)
KY : Louisville Gas & Electric/Kentucky Utilities
NY : Central Hudson Gas & Electric (CHG&E)
Interrupt rating
Depends on selected main circuit breaker
Enclosure
Outdoor
Bus Rating
800 A
Phase
Single-phase in, single-phase out
Voltage rating
120/240 V
Amperage Rating
200A

 

Features :

• The design often allows for easy access to each meter and breaker, facilitating straightforward maintenance, inspections, and meter reading without needing to enter individual units.

• Meter Packs generally include tamper-resistant features to prevent unauthorized access and ensure the integrity of the meter readings, which is crucial for both safety and billing accuracy.

• Meter Packs typically come with multiple meter sockets in a single enclosure, allowing for the metering of several units. The number of sockets can vary, commonly ranging from two to six or more, depending on the model and manufacturer.

Download PDF Spec Sheet

FAQ's

What is a meter socket and why do I need one?

A meter socket is a weatherproof enclosure that houses the electric meter and connects your service entrance conductors to the utility’s power lines. It allows the utility to measure your electricity usage and acts as a safe, secure interface between their system and your home’s wiring. Without it, your electric meter can’t function, and power can’t legally or safely be delivered to the home.

What are the different types of meter sockets?
  • Main breaker socket: Includes a built-in breaker for disconnecting service.
  • Main lug socket: No breaker, just lugs for wire terminations; requires a separate disconnect.
  • Ring-type socket: A locking ring is used to secure the meter (often required by utilities).
  • Ringless socket: Holds the meter with clips; makes it easier to access for service.
  • Overhead socket: Accepts power from overhead utility lines.
  • Underground socket: Accepts power from underground service laterals.
  • Bypass socket: Includes a mechanism to maintain service during meter removal.

Multi-position socket: Allows for two or more meters in a single enclosure (e.g., apartments).

What’s the difference between a 200-amp meter socket with a disconnect and a 200-amp meter socket with a main breaker?

A 200-amp meter socket with a disconnect lets you manually shut off power. A 200-amp meter socket with a main breaker does that and also protects against overloads or short circuits. It is required when local code mandates a main service disconnect at the meter location.

Do I need a 200 amp meter socket for my home?

Yes, if your home has a 200-amp service. Homes using more than 10–12 kW of peak demand usually need this rating. So yes, a 200-amp meter is required for a modern home with high power demand.

What is a 100-amp meter socket used for?

It’s used for 100 amp service, common in small homes under 1,000 sq ft, such as cabins, cottages, or older single-family houses with basic electric heating and appliances.

What is a 3-gang meter socket?

A 3-gang meter socket supports three meters in one housing and is used for triplexes, small apartment buildings, or multi-tenant commercial properties.

How do I know if a meter socket is bad, and can it be repaired, or does it need replacement?

Signs for a replacement include burn marks, loose meter jaws, rust/corrosion, or cracked housing. Minor wear (like a worn cover or missing knockout plug) can be repaired, but internal damage or safety risks require full replacement.

What meter socket do I need for a duplex, triplex, or fourplex?

Use a 2-gang, 3-gang, or 4-gang meter socket, respectively.

Can I use one meter socket to serve multiple tenants?

Yes, a multi-gang meter socket allows each unit to have its own meter and separate billing.

What’s the difference between a gang meter socket and individual meter sockets?

 Gang sockets combine multiple meters in one enclosure — neater and more cost-efficient for multi-unit buildings.

Do multi-family buildings need a disconnect for each unit?

 Yes, most utilities and codes require a separate disconnect for each meter position.

Can I install a 3-gang meter socket for a small apartment building?

Yes, if each unit needs separate metering.

How long does a meter socket last?

30+ years with proper installation and no exposure to water, rust, or physical damage.

What is a meter socket cover and when should it be replaced?

It protects internal components from the weather. Replace it if it is cracked or no longer seals properly.

Can I replace just parts of a meter socket, like jumpers or adapters?

Yes, if compatible, but full replacement is safer.

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
Get in Touch
Live Chat Get replies right away!
Email info@nassaunationalcable.com

Call Us: 1-516-482-6313    Text Us: 1-516-703-3460

Win an Exclusive prize!

Enter your full name and email to spin the wheel for a chance to win

Powered by CareCart